PART 2
Questions 11-14
Choose the correct letter, A, B or C.
Local council report on traffic and highways
11 A survey found people’s main concern about traffic in the area was
A cuts to public transport.
B poor maintenance of roads.
C changes in the type of traffic.
12 Which change will shortly be made to the cycle path next to the river?
A It will be widened.
B It will be extended.
C It will be resurfaced.
13 Plans for a pedestrian crossing have been postponed because
A the Post Office has moved.
B the proposed location is unsafe.
C funding is not available at present.
14 On Station Road, notices have been erected
A telling cyclists not to leave their bikes outside the station ticket office.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.